Single Pole MCB
Takes about 1 hr
Install or replace a single-pole MCB in a compatible distribution board to protect a single-phase circuit from overloads and short circuits
What is included
- • Existing MCB and circuit inspection.
- • MCB installation or replacement labour.
- • Basic electrical testing.
What is not included
- • New MCB and accessories.
- • Distribution board replacement.
- • New wiring or major modifications.
Verified technicians. Every technician is document-checked before taking jobs.
Pay your way. Online, or in cash after the service is done.