3 Phase panel board

Takes about 1 hr

Install or troubleshoot a three-phase electrical panel board for a compatible power distribution setup

What is included

  • • Basic panel and connection inspection.
  • • Installation or repair of specified components.
  • • Electrical testing after work.

What is not included

  • • New panel board and components.
  • • Utility connection or sanctioned-load changes.
  • • Major cabling and civil work.

Verified technicians. Every technician is document-checked before taking jobs.

Pay your way. Online, or in cash after the service is done.

More in Electrician

3 Phase panel board – Electrician, from ₹99 | Helloo Bhaiaah