3 Phase panel board
Takes about 1 hr
Install or troubleshoot a three-phase electrical panel board for a compatible power distribution setup
What is included
- • Basic panel and connection inspection.
- • Installation or repair of specified components.
- • Electrical testing after work.
What is not included
- • New panel board and components.
- • Utility connection or sanctioned-load changes.
- • Major cabling and civil work.
Verified technicians. Every technician is document-checked before taking jobs.
Pay your way. Online, or in cash after the service is done.